Cost Model Overview
In general, plastic molding costs are determined by aggregating material, labor, machine, and tooling costs. This overview section summarizes assumptions and limitations of the following aspects of the model:
General Process for Plastic Molding
Part Geometry for Plastic Molding
Materials for Plastic Molding
Machines for Plastic Molding
Tooling for Plastic Molding
This site works best with JavaScript enabled