Tooling for Composites
By default, hard tooling cost is calculated based on the following:
• Tool material cost: looked up by the current tool material (see
Layup Tool Material for Hand Layup,
Layup Tool Material for ATL, and
Layup Tool Material for AFP) in the
Layup Tool Cost Per Area column of the tool shop
Tool Materials table:
• Tool shop variable Region Multiplier.
Each layup process provides a setup option that allows users to override the default on a per-part basis, and specify the tool cost explicitly:
• Automated Tape Layup:
Layup Tool Cost Override • Automated Fiber Placement:
Layup Tool Cost Override