Selecting and editing an operation sequence
Clicking a row in the Operation Sequence table selects the operation sequence this row represents. Clicking a node selects the node and the row.
Selected node shows the cost status indicator:
Green — Costing on this node completed successfully.
Yellow — Costing on this node completed with warnings. Typically, indicates that feasibility rules were not evaluated for the operation.
Red — Costing on this node failed. Indicates that operation failed feasibility evaluation.
To select and edit an operation sequence
1 In the Geometric Cost Drivers pane, highlight a GCD, right-click and select Edit. The Operation Sequence Selection window is displayed.
2 Select an operation sequence.
3 Change operation sequence options as needed by Selecting alternative operations (see page 1) and Using the right-click menu (see page 1).
4 Click Ok to apply changes, recalculate the cost, and close the Operation Sequence Selection window; or click Apply to apply changes and recalculate the cost without leaving the Operation Sequence Selection window.
Note Once you selected an operation sequence and closed the Operation Sequence Selection window, aPriori remembers the costs calculated in the last costing event only. When you open the Operation Sequence Selection window again, only the sequences that were costed in the last costing event have values in the Time column. The uncosted sequences are displayed only if the View > Show Routings with Incomplete Cost option is selected.