SMT Visual Inspection
Category: Surface Mount
Description: The SMT Visual Inspection process validates the minimum requirements for the PCBA. Unlike Visual Inspection for Plated Through Hole (PTH) PCBAs which occurs after soldering, SMT Visual Inspection takes place prior to solder reflow when the solder paste is soft and allows for components to be corrected by the visual inspection operator.
Major Cost Drivers -- PCBA SMT Visual Inspection
SMT Visual Inspection Cycle Time is the sum the time required to perform the visual inspection of the PCB prior to reflow and the transport time of the PCB along the In-Line Workstation. The visual inspection time is currently set as a machine variable of 30 seconds. This may be altered later based on customer's specification, but this is a good average time for the inspection of an average PCB prior to insertion in reflow oven.
Process Time = Visual Inspection Time + Transport Time
Visual Inspection Time =(Machine variable)
Transport Time = Visual Inspection Conveyor Length/ Visual Inspection Conveyor Speed
Visual Inspection Conveyor Length = (Machine variable)
Visual Inspection Conveyor Speed = (Machine variable)
User Inputs –- PCBA SMT Visual Inspection
PSO: Fiducial Quantity
PSO: Clean Frequency
Global Inputs: PCB Length, PCB Width, PCB Thickness & Pocket Existence Check