User Guided Costing Node
The top-level PSO node includes one PSO, which is required. If you do not supply a value for this PSO, the part fails to cost.
Part Volume
Required
Part volume is a required input for all user guided processes. This is the volume of the material that constitutes the part.
Part volume is used to calculate part mass. Part mass is used in material cost and utilization calculations—see Material Cost and Utilization.
Enter a value greater than 0.