Primary Direct Costs
Material cost and direct overhead cost are calculated using the formulas below.
Material Cost = (Part Volume * Material Cost Per Volume / Utilization) / Final Yield
aPriori calculates the cost for material based on the following factors:
Part volume (specified by required PSO—see Part Volume)
Material cost per volume (see formula below)
Material utilization rate (see Material Utilization)
Final yield (see Yields)
Material Cost Per Volume = Material Cost Per Mass * Material Density
Material cost per volume is the product of the following quantities:
Material cost per mass (specified in the Material Selection dialog)
Material density (listed in the Material Selection dialog)
Labor Cost = Labor Rate * Labor Time / Final Yield
Labor cost is the product of the following:
Labor rate
Labor time (see Times below)
Final yield (see Yields)