Painting Formula
All costs are included in Additional Direct Costs. Cycle time and labor time are 0.
Additional Direct Costs = (Part Surface Area * Machine Surface Area Cost) / finalYield
Additional direct costs depend on the following:
Part surface area (obtained from geometry extraction)
Machine Surface Area Cost (specified by the machine property Surface Area Cost)