Bead Blast and Sand Blast Formulas
All costs for these processes are included in additional direct costs. Cycle time, labor time are 0.
Additional Direct Costs = Bead Blast Cost / Final Yield
Additional direct costs depend on the following:
Bead blast cost (see the formula below)
Bead Blast Cost = {
Minimum Batch Cost / Batch Size, if Batch Size * Part Weight < Minimum Batch Weight
Part Weight * Unit Weight Cost, otherwise}
Bead blast cost depends on the following:
Minimum batch cost (specified by the machine property Min Batch Cost)
Batch size (specified in Production Scenario information)
Part weight (product of part volume and material density, for non-assemblies)
Minimum batch weight (specified by the machine property Min Batch Weight)
Unit weight cost (specified by the machine property Unit Weight Cost)