Powder Loading Formulas
Cycle Time = Process Time * Adjustment Factor
Cycle time is the product of the following:
Process time (see formula)
Adjustment factor (specified by the cost model variable cycleTimeAdjustmentFactor). This factor is 1 in aPriori starting point VPEs. VPE administrators can modify cycleTimeAdjustmentFactor in order to adjust cycle times across processes within the current VPE.
Process Time = Load Time / Number of Parts
This is the time per part to load metal powder into the powder chamber. Process time depends on the following:
Load time: by default, this is specified by the cost model variable dmlsPowderLoadTime (300 seconds in starting point VPEs. Users can override the default with the setup option Powder Loading Time.
Number of parts (see Number of Parts for Metal Sintering)