Primary Direct Costs for Plastic Molding
IM and RIM Primary Direct Costs
Material cost and direct overhead cost are calculated using the formulas below.
Material Cost = (Part Volume * Material Cost Per Volume) / Utilization
aPriori calculates the cost for material based on the following factors:
Part volume (obtained by GCD Extraction)
Material cost per volume (see formula below)
Material utilization rate (see Material Utilization for Plastic Molding)
Material Cost Per Volume = Material Cost Per Mass * Material Density
Material cost per volume is the product of the following quantities:
Material cost per mass (specified in the Material Selection dialog)
Material density (listed in the Material Selection dialog)
Labor Cost = Labor Rate * Labor Time
Labor cost is the product of the following:
Labor rate
Labor time (see Times for Plastic Molding below)
SFM Primary Direct Costs
Material cost and direct overhead cost are calculated using the formulas below.
Material Cost = (Part Volume x Material Cost Per Volume x Percent Filled) / Utilization –
Foam Cost Per Part
With SFM, injection partially fills a part’s mold with material. Only after the foam expands is the mold’s entire volume occupied. So aPriori calculates the cost for material based on the following factors:
Part volume (obtained by GCD Extraction)
Material cost per volume (see formula below)
Percent filled (default of 0.75 specified in plant variables or user-specified value—see User Inputs for Plastic Molding)
Material utilization rate (see Material Utilization for Plastic Molding)
Material Cost Per Volume = Material Cost Per Mass x Material Density
Material cost per volume is the product of the following quantities:
Material cost per mass (specified in the Material Selection dialog)
Material density (listed in the Material Selection dialog)
Labor Cost = Labor Rate x Labor Time
Labor cost is the product of the following:
Labor rate
Labor time (see Times for Plastic Molding below)