Feasibility and Routing
When you choose the Sheet Metal process group, aPriori selects process-level routings, operation-level routings, as well as machines and materials. These procedures are described in the following sections:
Process-level Routing
Process-level Feasibility
Material Selection
Machine Selection
Operation-level Feasibility and Routing
This site works best with JavaScript enabled