Top-level setup options
The Forgin routing node provides the following setup options:
Enable Scrap Material Credit: By default in starting point VPEs, the cost model assumes that material scrap (for example, trim scrap) is not sold for credit. Administrators can customize the default with the cost model variable enableScrapMaterialCredit (false in starting point VPEs). With this setup option, users can override the default on a per-part basis.
Enabling scrap material credit increases material utilization and decreases material cost. The credit rate is specified as a percentage of the material rate by the material property Scrap Cost Percent.
Enable Scrap Part Credit: By default in starting point VPEs, the cost model assumes that the material from scrapped parts is not sold for credit. Administrators can customize the default with the cost model variable enableScrapPartCredit (false in starting point VPEs). With this setup option, users can override the default on a per-part basis.
Enabling scrap part credit increases material utilization and decreases material cost. This includes credit for parts scrapped by this process as well as by downstream processes. The credit rate is specified as a percentage of the material rate by the material property Scrap Cost Percent.