Degating Formulas
The Degating process uses the formulas below.
Cycle Time = Process Time * Cycle Time Adjustment Factor
Degating cycle time is the product of the following:
• Process time (see formula below)
• Cycle time adjustment factor: specified by the cost model variable cycleTimeAdjustmentFactor; 1 in aPriori starting point VPEs.
Process Time = (Total Ingate Area + Riser Base Area) / Degating Feed Rate)
Degating process time depends on the following:
• Total ingate area is the cross-sectional area of an ingate (see the formula for Ingate Area in
Gating System Model) times the number of ingates (see Number of Ingates in
Moldmaking Setup Options).
• Riser base area (see formula)
• Degating feed rate (specified by the machine property Feed Rate)
Riser Base Area = Pi * Riser Radius2
Riser base area depends on riser radius, which is half the riser diameter (see formula)
Riser Diameter = ( 8 * Riser Volume) / Pi )1/3
Because the riser height is assumed to be half the diameter, riser diameter can be determined from riser volume alone.