The Degating process uses the formulas below.
Cycle Time = Process Time * Cycle Time Adjustment Factor
Degating cycle time is the product of the following:
Process time (see formula below)
Cycle time adjustment factor: specified by the cost model variable cycleTimeAdjustmentFactor; 1 in aPriori starting point VPEs.
Process Time = (Total Ingate Area + Riser Base Area) / Degating Feed Rate)
Degating process time depends on the following:
Total ingate area is the cross-sectional area of an ingate (see the formula for Ingate Area in Gating System Model) times the number of ingates (see Number of Ingates in Moldmaking Setup Options).
Riser base area (see formula)
Degating feed rate (specified by the machine property Feed Rate)
Riser Base Area = Pi * Riser Radius2
Riser base area depends on riser radius, which is half the riser diameter (see formula)
Riser Diameter = ( 8 * Riser Volume) / Pi )1/3