Batch Setup
Amortized Batch Setup =
(Machine Setup Time * (Machine Labor Rate + Direct Overhead Rate)) /
Batch Size
Amortized batch setup is a function of the following:
• Machine setup time (specified as a machine property)
• Machine labor rate (specified as a machine property)
• Direct overhead rate (see
Direct and Indirect Overhead)
• Batch size (specified in the Production Info dialog)