Manufacturing process routing tree/table
The Manufacturing Process tree/table shows the sequence of steps required to manufacture a component.
Each manufacturing step may include further operations. Operations are organized by manufacturing technique. You can drill down into the GCDs for each specific operation.
Each manufacturing step presents iconic status and user input indicators. The status indicator provides a red/yellow/green icon to indicate an error/warning/success status. The user input indicator provides a green user icon to indicate that you have made an explicit component or process level edit (e.g. machine selection or Process Setup maintenance).
The following icons are used in the routing tree/table:
 
Icon
Usage
An operation.
An operation selected by aPriori.
An operation selected by you.
Multiple operations.
Multiple operations selected by aPriori.
Multiple operations selected by you.
A sub-operation selected by aPriori.
A sub-operation selected by you.
A GCD.
A GCD selected by aPriori.
A GCD selected by you.
Multiple GCDs
Multiple GCDs selected by aPriori
Multiple GCDs selected by you.
A status indicator in the Status column shows the costing status of the operation:
Green — costing completed successfully.
Yellow — costing succeeded with a warning. Typically, a warning means that the requested operation could not be used in costing, but costing succeeded with an alternative operation.
Red — costing failed.